We arrived at 4pm, January 27, 2007 in the middle of a cold front and it had started to snow. Eight Members attended. A walk through of the entire facility started at 4:15pm.

It had been agreed upon in advance that the investigation would consist of photographing and collecting evp in designated "hot spots". There were also several experiments to be conducted both from a scientific and sensitive's perspective.

Walkthrough: Core group does the initial walkthrough for comparison photographs and notes. Several windows were observed to be open. It was decided not to do temperature baseline readings. The wind was also high enough that it was rattling windows facing the south side of the building.

New Members: Alesha and Michael were introduced to the group then walked through the facility to point out obstructions/hazards.

The group broke for dinner and discussion then resumed the investigation at 6pm. The building was secured and no other inviduals were admitted throughout the course of the investigation.

Investigators did another walkthrough collecting photos and EVPs until approximately 7pm. At this point a unscheduled experiment was conducted (Blind Test) due to activity on the Third Floor.

Following the second walk through, the group broke up to set up the experiments in different areas: Plasma Sphere in the basement, The Human Bait on three and Scrying on five.

At the conclusion of the Human Bait and Scrying experiments, the entire group met in the basement to perfom the Plasma Sphere experiment.


Photos Taken: 228

Audio: 2.5 hours

Video: 4 hours